My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 11:58:49 AM
Creation date
1/13/2021 8:19:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6009 N EI Dorado, Stockton Record ID PR0542116 <br /> 11/10/2021 UST <br /> Photo 2: The designated operator failed to check and note the correct test date for the overfill prevention on the 12/10/2020 designated <br /> operator inspection report. A date was not listed in the report. <br /> Underground storage Tank <br /> _. I d usT Operator Visual Inspection Report <br /> Arlate <br /> SAH Ji IN Cdi i MIR@IIFHrai ID <br /> I866 E,4&1E fi 01. MA"' <br /> Yes No NA Date last <br /> Silgi,CP Y f G <br /> AND i performed <br /> 1 'niroring system Certification been completed within the past rl <br /> s910nths? been completed within the past <br /> tas spill container testing <br /> W< 12 months? <br /> cC ° Has overfill prevention equipment inspection been completed withinthe pass 38 months?as secondary containment testing been completed within the past <br /> 36 months?Has tank tightness testing been completed within required <br /> timeframes?Has line tightness testing beencompleted within therequired timeframes? <br /> Other Test 1 Maintenance:Other Test I Maintenance: <br /> Other Test I Maintenance: Annual Training Date <br /> 1 <br /> 11. FACILITY EMPLOYEE TRAINING FE <br /> +' <br /> Have all individuals performing facility employee duties received the required facility <br /> A. employee training within the past 12 months? <br /> r <br /> PN" 13. COMMENTS <br /> qA J Thrs section may be used to record comments or observations that are not current compliance <br /> Este add deficiencies. <br /> ra FhB SA <br /> TYPEOFSE <br /> Cou,E+Ts: <br /> - ACCEPTEp 9- <br /> ASSfeN�E TO: <br /> - Date Service <br /> Fee Amount <br /> Payrnent Type <br /> oimroB z-oss <br /> suers marked"No"must be described by the designated UST operator in Section 3. <br /> i. pane A s. <br /> John Alaniz, REHS Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.