Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6 , OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 DIESEL <br /> Are both vent and tank riser piping ❑✓ Yes ❑✓ Yes ❑✓ Yes ❑ Yes <br /> secondarily contained ? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model 71 SO 71 SO 71 SO <br /> What is the OPE response when activated ? ❑✓ Shut off ❑✓ Shut off ❑✓ Shut off ❑ Shut off <br /> (Check all that apply. ) Flow Flow Flow Flow <br /> ❑ Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑✓ Yes * ❑✓ Yes * ❑✓ Yes * ❑ Yes * <br /> that may interfere with the OPE operation ? ❑ No ❑ No ❑ No ❑ No <br /> At what level in the tank is the OPE set to 101 105 . 5 106 . 750 <br /> activate ? Inches from bottom of tank <br /> What is the percent capacity of the tank at o 94 0 94 0 <br /> which the OPE activates ? 91 . 3 /0 . 7 /0 . /o <br /> 9 <br /> Is the OPE in proper operating condition to ❑✓ Yes ❑✓ Yes ❑✓ Yes ❑ Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level ? <br /> 7 . SUMMARY OF TESTING RESULTS <br /> ❑✓ Pass ❑✓ Pass ❑✓ Pass ElPass <br /> OPE Inspection Results ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8 . COMMENTS <br /> Describe all results marked "Fail' and each proposed remedy. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required . <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In - Tank Setup report(s) <br /> Page 2 of 2 <br />