Laserfiche WebLink
S A N J 0 A Q I I I Irl Environmental Health Department <br /> CCUNT <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> PACIFIC AVE CHEVRON 6633 PACIFIC AVE, STOCKTON January 13, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator inspections for the following months were performed more than 30 days <br /> after the previous inspection: <br /> - Initial inspection on 05/16/2020, next inspection performed on 06/18/2020 (33 days) <br /> - Initial inspection on 07/15/2020, next inspection performed on 08/19/2020 (35 days) <br /> - Initial inspection on 09/16/2020, next inspection performed on 10/17/2020 (31 days) <br /> REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection. <br /> CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time <br /> frames. <br /> -------------------------------------- <br /> -------------------------------------- <br /> OBSERVATION: Designated operator reports were not signed within the required time frame. The 04/18/2020 and <br /> 08/19/2020 reports were not signed by the owner/operator. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report,the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> This is a repeat violation, Class ll. <br /> 209 CCR 2715(c)(3), 2715(c)(4) Failure to maintain a copy of the"Facility Employee Training Certificate"on-site. <br /> OBSERVATION: The Facility Employee Training Certificates had the following issues: <br /> -02/19/2020:the training date(7/7/20)for Rachel Makowsky was dated after the 02/19/2020 date of training <br /> -08/19/2020:the training dates for Timothy Taylor(9/15/2020), Tracy Shaw(9/26/2020), Simone Binoir(11/18/2020), <br /> and Sara Belasco(11/18/2020)were all dated after the 8/19/2020 date of training <br /> -Sara Belasco's initial training date was on 11/18/2020, after her date of assuming responsibility(3/10/2020) <br /> -Simone Binoir's initial training was on 11/18/2020. more than 30 days after her date of assuming responsibility on <br /> 12/07/2017 <br /> REGULATION GUIDANCE:All site employees must be trained prior to taking responsibility as a facility employee if <br /> after October 1, 2018, or within 30 days of hire if prior to October 1, 2018. The Facility Employee Training <br /> Certificate shall contain accurate information for all employees trained. <br /> CORRECTIVE ACTION: Update the Facility Employee Training Certificate to contain the accurate information and <br /> submit a copy of the updated form to the EHD. <br /> This is a minor violation. <br /> FA0003834 PR0231784 SCO01 01/13/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 5 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />