My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 2:55:48 PM
Creation date
1/14/2021 3:36:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 5. MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder-Root TLS-350 133.06 <br /> Attach the post-certification reports if the monitoring system is capable of generating Yes No NA <br /> either, ❑✓ Monitoring System Set-up ✓❑ Alarm History Report <br /> All monitoring equipment is operational per manufacturer's specifications? ❑✓ ❑ <br /> Secondary containment systems are free of damage, debris, or liquid? E✓ r <br /> Are the audible and visual alarms operational? IT r <br /> All sensors have been: 1) visually inspected for wiring kinks, breaks and residual © ri F7 <br /> buildup on floats; and 2) tested for functionality and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity in the <br /> secondary containment? <br /> The monitoring system set-up was reviewed, and proper settings confirmed? ❑✓ 0 <br /> Was the monitoring control panel's backup battery visually inspected, functionally ❑✓ ❑ ri <br /> tested, and confirmed operational? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- ❑✓ ❑ ❑ <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment ❑ ❑ ❑ <br /> monitoring system fails to operate or is electrically disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release? Which sensors initiate positive shut down? ❑✓ ❑ ❑ <br /> Check all that apply) ✓❑ Sump ✓❑ UDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all ❑ ❑ <br /> communication equipment operational? <br /> Describe all answers marked "No"or "Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 2of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.