Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 1-PS-Jet A 2-PS-Jet A 3-PS-Jet A 1-RPS-Jet A <br /> Sump Manufacturer Unknown FGC Unknown FGC Unknown FGC Unknown FGC <br /> Sump Depth (inches) 39" 42" 44" 39" <br /> Sump Bottom to Top of 26" 36" 38" 21" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:42 11:07 11:12 11:17 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 1:12 11:37 11:42 11:47 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Lss/FailCriteria > .002 > .002 > .002 > .002 <br /> htness Test Results M Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID 2-RPS-Jet A 1-TPS-Jet A 2-TPS-Jet A 3-TPS-Jet A <br /> Sump Manufacturer Unknown FGC Western FG Western FG Western FG <br /> Sump Depth (inches) 36" 48" 48" 48" <br /> Sump Bottom to Top of 24" 11" 17" 10" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:52 11:57 12:02 12:37 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 12:22 12:27 12:32 1:07 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />