Laserfiche WebLink
SAN J O A Q U I N Environmental Health Department <br /> 0o� <br /> COUNTY Jasjit Kang , REHS , Director <br /> P <br /> I tiFoa? Greatness grows here . Muniappa Naidu, REHS , Assistant Director <br /> - <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Michael Kith , REHS <br /> Melissa Nissim , REHS <br /> January 6 , 2021 <br /> Deborah Jones <br /> Elite IV Contractors <br /> 2535 Wigwan Drive <br /> Stockton , Ca 95205 <br /> Re : EI Dorado Gas & Food Mart SR0082976 <br /> 1901 S . EI Dorado Street , Stockton , Ca 95206 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of the <br /> application for a permit to do the following on the underground storage tank ( UST) system at the above <br /> noted address : <br /> • Remove and install new dispensers with conversion frames and deflector plates . <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work . All new addenda supersede the previous ones . <br /> 3 . Provide written notification to ust ( slgov . org to arrange the following appointments (a 48- hour <br /> notice is required for inspection appointments ) . <br /> a . Verification of the dispenser footprints contained by the under dispenser containment <br /> ( UDC) sumps . Any potential leaks from piping and fuel filters must drain directly into <br /> UDCs . <br /> b . Visual inspection of the piping within the dispensers for any leaks <br /> c . Verification of the installation of the Bravo conversation frames and deflector plates per <br /> manufacturer instructions . <br /> d . If concrete will be broken near the tank piping or sumps , a secondary containment test <br /> must be performed on the affected components once concrete is poured in accordance <br /> with the manufacturer' s guidelines and test results submitted to the EHD within 30 days <br /> of testing . <br /> Please be aware that the facility cannot operate the UST system prior to the EHD inspection <br /> and approval. <br /> 4 . Secondary containment testing for the affected components ( 3d ) is required six months after <br /> installation . Provide 48 hours notification to the EHD when this test is scheduled . <br /> 5 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br /> 1868 E . Hazelton Avenue Stockton , California 95205 T 209 468-3420 1 F 209 464-0138 1 www . sjgov . org /ehd <br />