Laserfiche WebLink
^lorksheetfor OPW E1 SO and 1"SO 5_ <br />/y1�1 <br />7 Appendix B <br />y Z 71 SO Overfill Valve in Tank Shut off Level Worksheet <br />Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br />manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br />tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br />shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br />Take the following measurements with the valve in- <br />stalled in the tank: <br />Distance from the 71 SO inlet tube flange to the cast <br />lug in the 71 SO body (see figures), upper tube length. <br />Note: the Upper Tube Length must be at least 16" to in- <br />clude the protective bend in the tube. <br />(D) _ r - 5' <br />Distance from the 71 SO inlet tube flange to the top and <br />botto17X e length. <br />(w) _ (U) _ <br />Distance from the 71 SO inlet tube flange to the bottom <br />of the tank. Note: If a tank bottom protector is present it <br />may be necessary to add this thickness to dimension <br />(OPW 6111 & 61TP models add 0.6") <br />(B)= .r- /'np— <br />From the tank calibration chart provided by tank manu- <br />facturer find the dipstick number m which corresponds <br />to the 100% volume. <br />(Y) _ /// "S-0 - I/ /• 5-4 <br />1. To determine shut-off percentage: <br />Subtract upper tube length (D) from distance to tank <br />bottom (B) — F Y, <br />Using the tank calibration chart provided by the tank <br />manufacturer determine the tank capacity at the cal- <br />culated (X) dimension and the 100% volume (Y) tank <br />capacity. �( <br />(X) tank capacity in gallons <br />(Y) tank capacity in gallons = q0 � 6 3043 <br />SO% _ (X) capacity / (Y) capacity x100 <br />Note: The overfill valve must be installed per AHJ require- <br />ments and all applicable local, state, and national codes. If <br />the overfill valve is set above the allowable shut-off percent- <br />age the overfill valve must be removed and replaced. For <br />reference 40 CFR part 280 Subpart B Section 280.20 overfill <br />valves should be set to a maximum of 95%. <br />21 <br />(D) <br />-'4 <br />Upper <br />Tube <br />(W) Valve <br />Length, <br />bottom of <br />cut <br />(B) <br />To Tank <br />M <br />Tank <br />(U) Valve <br />Length, <br />Chart <br />100% <br />top of cut <br />Volume <br />Dipstick <br />Note: The overfill valve must be installed per AHJ require- <br />ments and all applicable local, state, and national codes. If <br />the overfill valve is set above the allowable shut-off percent- <br />age the overfill valve must be removed and replaced. For <br />reference 40 CFR part 280 Subpart B Section 280.20 overfill <br />valves should be set to a maximum of 95%. <br />21 <br />