Laserfiche WebLink
41 <br /> OPW 71SO Overfill Materials Important <br /> Prevention Valves , In order to prevent product <br /> Valve Body: Cast aluminum [ spillage from the Underground <br /> Storage Tank (UST), properly <br /> The CARE certified OPW 7150 <br /> Float: Nitrile rubber, closed cell foam I maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve Valve : Aluminum and a proper connection at the <br /> is designed to prevent the overfill of t 4 tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals : Viton' Delivery personnel should <br /> 6 be managed and trained <br /> a positive shut-off of product delivery. Upper & lower Drop Tube: Aluminum to inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts : Acetal and hoses for damaged and <br /> the drop tube used for gravity filling . 0 ' t missing parts. They should <br /> Hardware : Stainless steel CAI always make certain there <br /> The OPW 71 SO allows easy installation I 1 1 is a positive connection <br /> '1 i1ltt ' between the adaptor and <br /> (without breaking concrete) and requires P <br /> F81tUr(' S elbow. If delivery equipment <br /> no special manholes. ® Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> stage shut-off valve. When the liquid coupled pi the adaptor, a <br /> g q special manholes required . serious spin may result when <br /> level rises to about 95% of tank Economical — costs a fraction the DPW 7150 closes, causing <br /> capacity, the valve mechanism is a hazard and environmental <br /> of expensive, complicated and contamination. <br /> released, closing automatically with difficult-to install valves. <br /> the flow. This reduces the flow rate to <br /> approximately 5 m through a bypass Furnished Complete — supplied f. NOTE: The OPW 71 SO is <br /> pp y gp g Yp designed for use ontight-fill <br /> valve. The operator may then stop the with new upper and lower drop tubes, gravity drop applications only, <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95% level, the valve will so� Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform, no resets ® Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> if the delivery isnot stopped and the or abused . Quick Drain Feature — <br /> liquid rises to about 98 % of tank � No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved. <br /> completely. No additional liquid can flow ®, Will Accept a Dipstick 4$� Best Flow Rate in The Industry* <br /> into the tank until the level drops below for Gauging <br /> a reset point. • OPW Test Lab results <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and o Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation - does not rely on the spill risk. <br /> determine the regulatory requirements alertness or speed of response of the 4> Speeds Delivery Operations <br /> governing shut-off capacity in your delivery attendant for certainty of — product flows unimpeded into <br /> region, as well as take into account overfill prevention . the tank until the hose " kick " that <br /> other considerations such as extreme 4. Keeps the Top of UST " Dry," accompanies the valve shut-off <br /> tank tilt. In all cases, the upper tube <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 6112 to ensure that the valve can shut <br /> eliminating possible leaks at loose liquid has reached the shut-off level . <br /> off flow into the tank completely before bung fittings and the need for o Simple and Inexpensive <br /> uble containment on vent lines. Installation mon* both two-point <br /> the top of the tank is wetted as per do <br /> EPA requirements. + Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow - allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order I vent piping are required . <br /> Number: H15524PA <br /> [ Loot; for this label for <br /> Listings ando authentic OPW EvilUL(; ►W+ ti Approved products. <br /> Certifications aeiouues 6o id or� w . OPW 7150 is EVR Approved for E85 <br /> 704 , p /r 5111 <br /> 3 <br />