Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />JOE'S TRAVEL PLAZA 15GOO HARLAN Rd- LATHROP <br />i?IPLNGx <br />(ARRMTS) <br />Draikia= of piping <br />cut of sump and <br />LTDC's. "%n <br />and-9—nd <br />draivmg is <br />accurate, xve <br />cannot speculate <br />bile prim". <br />...................... Imo' <br />=r'i.'+T bTL_kx <br />F = FILLS <br />T = YL-3MNE <br />F = PFJIBE <br />G = VA?0Fx <br />X = SL'lIP-IMNSOR <br />L = Leak Detectar <br />3,1=-kIsn3r-kr <br />S =Brine Sensor <br />I = SWM1 Seoso-r <br />5 = 5TP <br />C = Floats & Chaiva <br />._3r�ifarlarrnderaarma�ffivt�arexaYrisibiefoiia?*�iingfxiaerciarecrsa <br />pgresai--ioprnr—ono -ard—sol4,fop-irfo---1prupaeas. Drmrrr�g <br />Wf to sclis <br />Dade map was drawn: 11727 <br />lnstru C6ofts <br />E = E Stop <br />If you already have a diagram that shows an required information_ you may include it rather than this page, with your Monitoring System Certification. On yoursite plan, <br />sham ttre general layout of tanks and piping. Ckariy identify looat a m of the following equipment, if installed: manhxrirng system control panels; sensors monitoring lank <br />annular spaces, sumps, dispenser pans, spill containers, or other seca*dary cantainment areas: mechanical or eferAronm Jine leak dete las; and in -tank liquid level <br />gnshes {rf used for Peak de'iectionj. In the space provkMd, note the date chis SAe Plan was prepam-d. <br />Page 6 of 6 <br />