Laserfiche WebLink
EBW Phase I Equipment <br />Required Inspection & Maintenance <br />Spill Containment Manholes <br />• Perform inspection and maintenance duties at least <br />once a year. <br />• Remove any standing liquid and dispose of it properly. <br />• Brush all buildup off of the brass drain valve screen of <br />applicable). <br />• Remove all dirt and foreign materials. <br />• Scrape all foreign materials away from the tank lid <br />sealing surfaces. <br />• Should it be necessary to replace a drain valve due to <br />breakage or considerable contamination buildup, use <br />EBW 705-337-19 Replacement Drain Valves only. <br />• Perform a leak test using the established "Pressure <br />Integrity Test" for a combination of Drop Tube, Drain <br />Valve, and Overfill Prevention Device (TP201.1 D). <br />• Use 90079 Drop Tube Isolation Test Kit. <br />Rotatable Fill & Vapor Adapters, Dust Caps & <br />Probe Riser Adapters <br />• Perform inspection and maintenance duties at least <br />once a year. <br />• Inspect all product and vapor riser dust cap seals for <br />damage. If damage is observed, replace the seal with <br />either the Aluminum Vapor Cap Seal or the Nylon <br />Product Cap Seal. <br />• Perform Rotatable Adapter maintenance as specified by <br />Phil -rite Enterprises, Inc. Perform established 'Static <br />Torque Test", TP201.1 B. <br />• Leak testing should be accomplished during the <br />"Pressure Integrity Test" for a drain valve or Drop <br />Tube Mounted Overfill Valve, TP201.1 C or TP201.1 ❑. <br />Annual maintenance of the probe riser cap assemblies <br />is normally not required. Whenever probe service is <br />necessary, inspect the service cap seal for damage and <br />replace it, if necessary, at that time with a Probe Riser <br />Cap Seal. <br />C 2015 F-6308 rev 3 <br />Drop Tube Mounted Overfill Prevention <br />Valves <br />• Perform inspection and maintenance duties at least <br />once a year. <br />• Inspect the inside of drop tubes for broken dip sticks or <br />noticeable damage to the valve flapper. If any damage is <br />observed, then the valve must be replaced. <br />• If it has not already performed during drain valve testing, <br />leak test the Drop Tube assembly using the established <br />"Pressure integrity Test" for Drop Tube/ Overfill <br />Prevention Device (TP201.1 C or TP201.1 ❑). <br />EBW doesn't require that the drop tube be pulled for <br />inspection unless damage is noted. Should local authority <br />require removal of the drop tube, the following seals and <br />inspection steps are necessary: <br />• Replace Drop Tube Isolation Gland (if applicable) seal <br />kit -90090 <br />• Replace Drop Tube Flange Gasket --11182-01 <br />• Inspect the Tank Bottom Protector for freedom of <br />movement. Repair or replace if necessary. <br />• Inspect OPD components, use instructions on EBW <br />from 6329. <br />• inspect drop tube joint sealant. Repair with EBW part # <br />11372-01 only. <br />Ball Floats & Extractor Valve Bodies <br />• No annual maintenance is required. <br />Pressure Vacuum Vent Valves <br />• Perform the required maintenance as specified by <br />Husky Corporation. <br />At least once every three years, unless otherwise specified <br />by a local authority, perform the established "Static <br />Pressure Performance Test" jP201.3j. <br />Please contact Technical Support if assistance is needed. <br />460 <br />Franklin Fueling Systems <br />3760 Marsh Road <br />Madison, WI 53718, U.S.A. <br />Tel: +1 608 838 8786 <br />Tel: USA & Canada 1 Boo 225 9787 <br />Tei; Mexico 001 800 738 7610 <br />www.f ran kl i of Ue I i ng. c o m <br />