My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 9:43:15 AM
Creation date
1/19/2021 9:28:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Presto, Carol [EHD] <br /> From: THOMSON, ALTON DUKE <at5145@att.com> <br /> Sent: Wednesday, February 24, 2021 3:35 PM <br /> To: Presto, Carol [EHD] <br /> Cc: WAMSLEY, RAYSHELL T <br /> Subject: Notice To Comply: Pacific Bell Telephone Co, UE020, 124 W ELM ST, LODI, CA, 95240 <br /> Attachments: DUSTO [UE0201 [LODICA011 20210119.pdf, DUSTO [UE0201 [LODICA011 20210216.pdf, <br /> U E020_RTC.pdf <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Inspection Report Date: 2/2/2021 <br /> Location: UE020 <br /> Address: 124 W ELM ST, LODI, CA, 95240 <br /> ITS#: 191705 <br /> CERS ID#: 10207012 <br /> Code: CCR 2712(f) and CCR 2716(a-e) <br /> Inspector Presto, <br /> Attached is the RTC form and email in response to the violations. Due to a manager being out on leave at the time and <br /> throughout the past year, we have implemented a process by having an acting manager respond to inspection reports in <br /> a timely manner.Also this process implementation will resolve noncompliance of CCR 2716(a-e).Attached are the most <br /> recent DUSTO which were received, reviewed, and signed on time. We are pleased to report the status of the corrective <br /> actions that you require pursuant to your inspection referenced above: <br /> CCR 2712(f) -Within 30 days of receiving an inspection report from either the local agency or the special inspector, the <br /> permit holder shall implement the corrections specified in the inspection report and comply with the permit conditions. <br /> The corrective action shall include all of the recommendations made by the local agency or special inspector.The local <br /> agency may waive the implementation of any of the special inspector's recommendations based on a demonstration by <br /> the permit holder to the local agency's satisfaction that failure to implement the recommendation will not cause an <br /> unauthorized release. <br /> 23 CCR 16 2716(a)through (e) -Conduct the DO visual inspection at least once every 30 days. Be performed by an ICC <br /> certified DO. Inspect monthly alarm history report, check that alarms are documented and responded to appropriately, <br /> and attach a copy. Inspect for the presence of liquid/debris in spill containers. Inspect for the presence of liquid/debris <br /> in under dispenser containment (UDC) and ensure that the monitoring equipment is positioned correctly. Inspect for <br /> liquid or debris in containment sumps where an alarm occurred with no service visit. Check that all testing and <br /> maintenance has been completed and documented.Verify that all facility employees have been trained in accordance <br /> with 23 CCR 2715(c).The owner/operator sign and date the Designated Underground Storage Tank Operator Visual <br /> Inspection Report within 72 hours of being provided a signed copy. <br /> Status: Completed <br /> We trust we are in full compliance with all the requirements that resulted from this inspection. If you need anything <br /> more from us to close this matter, please contact me. <br /> Sincerely, <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.