My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NEWCASTLE
>
7650
>
2800 - Aboveground Petroleum Storage Program
>
PR0527758
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2021 8:22:18 AM
Creation date
1/19/2021 3:56:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0527758
PE
2832
FACILITY_ID
FA0003938
FACILITY_NAME
CDCR-NORTHERN CALIFORNIA YOUTH CORRECTIONAL CENTER
STREET_NUMBER
7650
Direction
S
STREET_NAME
NEWCASTLE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18115002
CURRENT_STATUS
01
SITE_LOCATION
7650 S NEWCASTLE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Management Approval and Certification <br /> Management Approval <br /> MANAGEMENT APPROVAL: In accordance with 40 Code of Federal Regulations Part 112 (40 CFR <br /> 112), this SPCC Plan is fully approved by the management of Northern California Youth <br /> Correctional Center, which commits the manpower, equipment, and materials necessary to fully <br /> implement this plan. Management has approved this Plan and is fully prepared to commit the <br /> necessary resources to implement this plan. <br /> I have reviewed and approve this SPCC Plan for the Northern California Youth Correctional <br /> Center. I also certify under penalty of law that I have personally examined and am familiar with <br /> the information submitted (included) for the applicability of the Substantial Harm Criteria <br /> Analysis, and that based on my inquiry of those individuals responsible for obtaining this <br /> information, I believe that the submitted (included) information is true, accurate and complete. <br /> Signature: Date: <br /> Name: Title: <br /> Professional Engineer Certification <br /> P.E. CERTIFICATION: By means of this certification, I hereby attest to the following: that I am <br /> familiar with the requirements of 40 CFR Part 112; that my agent has visited and examined the <br /> facility; that the Plan has been prepared in accordance with good engineering practice, including <br /> consideration of applicable industry standards, and with the requirements of 40 CFR Part 112; <br /> that procedures for required inspections and testing have been established; and that the Plan is <br /> adequate for the facility. <br /> This certification shall in no way relieve the owner or operator of the facility of their duty to <br /> prepare and fully implement this Plan in accordance with the requirements of 40 CFR Part 112. <br /> This Plan is valid only to the extent that the facility owner or operator maintains, tests, and <br /> inspects equipment, containment, and other devices as prescribed in this Plan. <br /> Printed Name: Signature: <br /> Registration Number: State: California Date: <br /> Engineer's Seal: <br /> Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.