Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 DIESEL <br /> Are both vent and tank riser piping © Yes © Yes Yes ® Yes <br /> secondarily contained? ® No ® No ® No © No <br /> OPE Model <br /> What is the OPE response when Shut off ® Shut off ® Shut off © Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ® Restricts ORestricts © Restricts © Restricts <br /> Flow Flow Flow Flow <br /> ® Audible © Audible © Audible © Audible <br /> Alarm Alarm Alarm Alarm <br /> © Visual © Visual © Visual rl Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ® Yes* R Yes* rl Yes* ® Yes* <br /> that may interfere with the OPE operation? ® No ® No ® No © No <br /> At what level in the tank is the OPE set to <br /> 80.75" 82.25" 80.75" <br /> activate? Inches from bottom of tank) <br /> What is the percent capacity of the tank at 94.55% 95.75% 94.55% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to R Yes ® Yes* R Yes* Yes* <br /> respond when the stored substance © No ® No ® No R No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass © Pass ® Pass © Pass <br /> © Fail R Fail © Fail rl Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> 91 OPE IS OVER 95% AND WILL NEED TO BE REPLACED AND RETESTED. <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />