My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
2300 - Underground Storage Tank Program
>
PR0231161
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 8:44:04 AM
Creation date
1/20/2021 7:39:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231161
PE
2361
FACILITY_ID
FA0003726
FACILITY_NAME
fast and easy mart #103
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
079-170-390-000
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN10 A Q U I N Environmental Health Department <br /> COUNTY - - RECE' lVED <br /> UST SYSTEM RETROFIT OR REPAIR APR 15 2021 . <br /> ( Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES [ ] NO [ ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> 2 . Submit copies of ICC Service Technician and /or Installer' s certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the " Site Health and Safety Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component , describe <br /> how this will be done . ( If adding piping , UDC ' s , or other UST equipment , or performing tank top upgrade , <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review) : <br /> Replacement (2) OPW Spill bucket replacement <br /> OPW1 C-3112D <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third - party approval ) : <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal ? YES [ ] NO [x] <br /> b . Identify contractor performing decontamination : <br /> Name Phone ( ) <br /> Address City Zip <br /> 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.