My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 4:03:29 PM
Creation date
1/20/2021 9:53:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�r <br /> UNDERGROUND STORAGE TANK <br /> DF%GNATED UNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT tPage <br /> VII, INSPECTION HISTORY 2012) <br /> Nas�documentation <br /> n of Section III from the previous inspection been completed appropriately? <br /> Attarifying appropriate service to this report- Y N <br /> tom, <br /> Vlll. ALARM HISTORY ® ❑ <br /> Attach a copy of the alarm histo report/log to this report. Y N NA <br /> Is the monitoring system powered on and in roper OP ratingemode? ® ❑ ❑ <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? ❑ ❑ <br /> Attach documentation veritying appropriate service to this report. <br /> Have all containment sumps that have had a leak detection alarm since the previous inspection been responded to by a ❑ ❑ <br /> —qualified UST Service Technician? <br /> List below In Section IX all containment sums that have had a leak detection alarm since the previous Inspection and have not been <br /> responded to by a qualified UST Service Technician.Containment sumps listed below require a visual inspection for damage, water,debris, <br /> hazardous substance,and ro er sensor location. The results of the visual inspection must be recorded In Section IX. <br /> IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage,water,debris,and hazardous substance? <br /> Contalnment Sum ID Y N Containment Sump ID Y N <br /> ❑ ❑ ❑ ❑ <br /> ❑ a 10 _❑ <br /> ❑ 01 ❑ ❑ <br /> ❑Are alt sensors in containment sumps inspected located to detecta leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage,water, debris,and hazardous substance? <br /> Tank ID Spilt Bucket-87 EAST <br /> Tank ID <br /> Is Bucket-8T WEST ❑ Tank ID Spill-Bucket_91 �) ❑ <br /> Is the fill pipe free of obstructions? ❑ Tank ID Spill Bucket-Additive SCJ ❑ <br /> Tank ID SpiiT Bucket=8TE <br /> Tank ID p ❑ Tank ID piffBucke- ❑ <br /> Spill Bucket-87 WEST ® ❑ Tank ID Spill Bucket-Additive <br /> Is the fitl cap securely on____Ihe fii pipet ® ❑ <br /> Tank ID Spill Bucket-87 EAST <br /> ® ❑ Tank ID Spill Bucket-91 ❑ <br /> Tank ID Spill Bucket-87 WEST IN C3 Tank ID Spill Bucket-Additive <br /> T Is the under-dispenser containment free of damage, water,debris,and hazardous substance? ❑ <br /> Under-Dispenser Containment ID Y N NA <br /> tSperlser- Under-Dispenser Containment ID Y N N <br /> Dispenser-3/4 ® ❑ ❑ Is—pe nse�=1 /14 ® ❑ ❑ <br /> tspen—se r-6 6d ❑ ❑ Dispenser-15/16 <br /> Q9 ❑ ❑ ❑ O <br /> FS pense�--7'[S CK ❑ 0 ❑ ❑ ❑ <br /> Dispenser-9%10 ® ❑ p ❑ <br /> bispenser-1 12 ❑ ❑ ❑ ❑ ❑ <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? ❑ ❑ ❑ <br /> ® Cl ❑ <br /> X. TESTING AND MAINTENANCE Y N NA Date Last <br /> Performed <br /> Has the monitoring system certification been completed within the past 12 months? l- <br /> ❑ ozo Vi <br /> Has the spill container testing been completed within the past 12 months? ❑ <br /> _ _ _ _ Illq <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? <br /> x ❑ ❑ 05/21/2019 <br /> Has the secondary containment testing been completed within the past 36 months? ❑ ❑ 9 N/A W�a,f <br /> Has the tank tightness testing been completed within required timeframes? ❑ ❑ ® N/A <br /> Has the line tightness testing been completed within the required timeframes? 0101 ® N/A <br /> Other required testing/maintenance was completed within required timeframe. (List test/maintenance items below.) <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> XI. FACILITY EMPLOYEE TRAINING Y IN <br /> Nave all individuals performing facility employee duties received the required facility employee training within the past 12 months? ❑ <br /> 1 the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> Y=Yes,N =No,NA=Not Applicable,ID=Identification <br /> COSTCO-1091 -0412312020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.