Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1 87A T2 87B T3 91 T4 Additv <br /> Are both vent and tank riser piping ® Yes ® Yes ® Yes ® Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model Veeder Veeder Veeder Veeder <br /> What is the OPE response when ❑ Shut off ❑ Shut off ❑ Shut off ❑ Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ® Audible ® Audible ® Audible ® Audible <br /> Alarm Alarm Alarm Alarm <br /> ® Visual ® Visual ® Visual ® Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> that may interfere with the OPE operation? ® No ® No ® No ® No <br /> At what level in the tank is the OPE set to 101 inch 101 inch 101 inch 40 inch <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 90 % 90 % 90 % 90 % <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ® Yes ® Yes ® Yes ® Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass ® Pass ® Pass ® Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />