My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 4:03:29 PM
Creation date
1/20/2021 9:53:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XIII. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors(LLD)are NOT installed. (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ❑ ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified: ® 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br /> Was the testing apparatus properly calibrated? ® ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ® ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? ® ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ® ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ® ❑ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ® ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ® ❑ ❑ <br /> For any answer of"N"above,describe in section Xlll how and when these issues were or will be corrected. <br /> XIV. COMMENTS <br /> This station has three Veeder-Root electronic leak detectors for the 87A, 87B, and 91 tanks. <br /> This station has one FePetro mechanical leak detector for the aboveground additive tank. <br /> XV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ®Vacuum ❑ Pressure ® Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s)Monitored by this Sensor Test Test <br /> S09 87A PRODUCT LINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> S10 87A VAPOR LINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> S11 87A VENT LINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> S12 87B PRODUCT LINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> S13 87B SYPHON LINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> S14 87 VENT LINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> S16 ATM P SENSOR ® Pass ❑ Fail ® Pass ❑ Fail <br /> S17 91 PRODUCT LINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> S18 91 VENT LINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> S23 ADDITIVE PRODUCT LINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> S24 ADDITIVE VENT ® Pass ❑ Fail ® Pass ❑ Fail <br /> L1 87A TANK ANNULAR BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L2 87B TANK ANNULAR BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L3 91 TANK ANNULAR BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L4 91 TANK ANNULAR BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L5 87A TURBINE SUMP BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L6 87A FILL SUMP BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L7 87B TURBINE SUMP BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L8 UNLEADED VENT BOX SENSOR BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L9 87B FILL SUMP BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L10 91 TURBINE SUMP BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> 1-11 91 FILL SUMP BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L12 UNLEADED VENT BOX BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L13 ADDITIVE STP SENSOR ® Pass ❑ Fail ® Pass ❑ Fail <br /> L14 ADDITIVE STP SENSOR BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L15 ADDITIVE VENT BOX SENSOR BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> L16 ADDITIVE VENT BOX BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> 1-21 L22 DISP 1&2 BRINE DISP 3&4 BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> 1-23 L24 DISP 5&6 BRINE DISP 7&8 BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> 1-25 L26 DISP 9&10 BRINE DISP 11&12 BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> 1-27 L28 DISP 13&14 BRINE DISP 15&16 BRINE ® Pass ❑ Fail ® Pass ❑ Fail <br /> How was interstitial communication verified? ® Simulated leak at far ends of the interstitial space. ®Visual Inspection <br /> ❑ Other(Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ®Yes ❑ No(Describe the reason in section XV below.) <br /> For any answer of"FAIL"above,describe in section XV how and when these issues were or will be corrected. <br /> XVI. COMMENTS <br /> GPH=Gallons per hour,Y=Yes,N=No,NA=Not applicable,VPH=Vacuum/Pressure/Hydrostatic,ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.