Laserfiche WebLink
DocuSign Envelope ID: 0336570A-ED5A-480E-9109-1037B256AF9B <br />LLNL-AM428479 <br />• Fire Department (13-890 at Site 300 and 13-323 at Livermore site) <br />• Environmental Functional Area (T-3726) <br />• Radioactive and Hazardous Waste Management (B-877) <br />• Emergency Operations Center (13-490) <br />• Health Services Department (13-889 at Site 300 and 13-663 at Livermore site) <br />• Safeguards and Security Department (13-274) <br />• Site 300 Manager's Office (13-871) <br />• Site 300 Environmental Analyst's Office (B-871) <br />A copy of the General Plan with the Site-specific Plan shall be provided to participants <br />in the Twin Valley Mutual Aid Agreement (see Section 3). <br />1.3.2 Revisions to the Contingency Plan <br />This Contingency Plan shall be reviewed periodically by applicable programs/ <br />departments, ES&H Team, and EFA. The ES&H Team Environmental Analyst shall be <br />informed immediately by the responsible program/department if any of the following <br />occur: <br />• The Contingency Plan, if properly followed, fails in an emergency, or <br />• There is a change in WAA design, construction, operation, or maintenance in a <br />way that increases the potential for fires, explosions, or releases of waste or <br />waste constituents, or changes the response necessary in an emergency, or <br />• The list of Emergency Coordinators changes, or <br />• The list of emergency equipment changes, or <br />• Applicable regulations are revised. <br />EFA will coordinate the periodic review of the Contingency Plan, and the updated Plan <br />will be distributed to all appropriate programs/departments and external agencies. <br />2. RESPONSIBILITIES <br />This section presents the responsibilities of the Emergency Coordinator, Incident <br />Commander, WAA Operator, WAA Coordinator, EDO, ES&H Team Environmental <br />Analyst, support organizations, and the Fire Department. <br />2.1 Emergency Coordinator <br />The Emergency Coordinator has the authority to commit LLNL resources and the <br />capability to obtain outside resources needed to carry out this Contingency Plan. Some <br />of these responsibilities can be delegated. <br />S300 WAA Contingency Plan 6 September 2018 <br />