Laserfiche WebLink
DocuSign Envelope ID: 0336570A-ED5A-480E-9109-1037B256AF9B <br />LLNL-AM428479 <br />Table D-3. Spill Kit Supplies <br />Supplies Quantity Use Location <br />Face shield 2 each Protect against chemical splash. Spill kit cabinet, north <br />exterior of WAA <br />Goggles 2 pairs Protect against chemical splash. Spill kit cabinet, north <br />exterior of WAA <br />Booties 8 pairs See Appendix A ("Personal Protective Spill kit cabinet, north <br />Equipment") in the Contingency Plan exterior of WAA <br />for Site 300 Waste Accumulation <br />Area(s). <br />Tyvek coveralls 6 pairs See Appendix A ("Personal Protective Spill kit cabinet, north <br />Equipment") in the Contingency Plan exterior of WAA <br />for Site 300 Waste Accumulation <br />Area(s). <br />Neoprene gloves 4 pairs See Appendix A ("Personal Protective Spill kit cabinet, north <br />Equipment") in the Contingency Plan exterior of WAA <br />for Site 300 Waste Accumulation <br />Area(s). <br />Leather gloves 4 pairs Protect against sharp or rough Spill kit cabinet, north <br />surfaces. exterior of WAA <br />Rubber aprons 4 each Protect against chemical splash. Spill kit cabinet, north <br />exterior of WAA <br />Bicarbonate of soda 1 bag To neutralize acid spills. Spill kit cabinet, north <br />exterior of WAA <br />Kay drys 4 boxes Absorb water, solvents and oils. Spill kit cabinet, north <br />exterior of WAA <br />Push broom 2 each Sweep absorbent material for ultimate Spill kit cabinet, north <br />placement in waste containers. exterior of WAA <br />Drysorb 4 bags Contain and absorb spilled acids, Spill kit cabinet, north <br />bases, solvents, oils, hydraulic fluids, exterior of WAA <br />PCBs, organic solvents, and coolants. <br />NOT FOR USE ON HYDROFLUORIC <br />ACID <br />Shovel 1 each Provides for cleanup of absorbent and Spill kit cabinet, north <br />solids. exterior of WAA <br />Dust pan 2 each To be used in conjunction with brooms Spill kit cabinet, north <br />for cleanup of absorbent or solids, exterior of WAA <br />Barrel pump 1 each To transfer material from one drum to East side of WAA <br />another. <br />S300 WAA Contingency Plan D9 September 2018 <br />