Laserfiche WebLink
9 <br /> Brusca Associates, Inc. <br />1860 Sierra Gardens Drive, #332 <br />Roseville, CA 95661 <br />Phone (916) 677-1470 <br />Fax (916) 677-1471 <br />BruscaAssociates.com <br />From: Palmer, Ann@Waterboards <Ann.Palmer@waterboards.ca.gov> <br />Sent: Thursday, March 22, 2018 2:10 PM <br />To: Joe Brusca (jbrusca@bruscaassociates.com) (jbrusca@bruscaassociates.com) <jbrusca@bruscaassociates.com> <br />Cc: Djuth, Gerald@Waterboards <Gerald.Djuth@waterboards.ca.gov>; 'Glenn.Young@CalRecycle.ca.gov' <br /><Glenn.Young@CalRecycle.ca.gov>; 'Sabra.Ambrose@CalRecycle.ca.gov' <Sabra.Ambrose@CalRecycle.ca.gov>; Robert <br />McClellon (rmcclellon@sjcehd.com) <rmcclellon@sjcehd.com>; 'danap@reynoldsandbrown.com' <br /><danap@reynoldsandbrown.com> <br />Subject: Former Pilkington Excavation Activities during Inclement Weather & Field Schedule <br />Hi Joe, <br />To follow up on the voicemail I just left you, I want to reiterate that we received your 3/18/2018 email notification that <br />the contractor determined the site was dry enough to proceed with cap soil removal on 3/19/2018. <br />Regional Water Board is concerned that all the rain that has been forecast and continues to fall is going to make things <br />messy for the excavation and can create a problem with contaminant migration, etc, if soil is saturated, or if there is <br />standing water. Staff expects implementation of best management practices to prevent soil, silt, waste, and COCs from <br />leaving the excavation area during wet weather conditions. <br />Please provide: <br />1. an update on excavation activities, <br />2. pictures of the excavation area and implemented wet weather mitigation measures, and <br />3. an estimated schedule of field activities. <br />Thank You, <br />Ann M. Palmer <br />Water Resource Control Engineer <br />Site Cleanup Section <br />(916) 464-4825 <br />Ann.Palmer@waterboards.ca.gov <br />Central Valley Water Board <br />11020 Sun Center Drive, Suite 200 <br />Rancho Cordova, CA. 95670 <br />