Brusca File No. 137-002 <br /> <br />Page 7 <br />May 7, 2018 <br />DRAFT Murphy Parkway Property Waste Materials Reuse Workplan <br /> <br />resistance to leaching and by creating an elevated pH environment. The cement treatment process <br />results in an impermeable monolith that substantially reduces surface area available for leaching. <br />Moreover, the increased pH of the treated material (caused by alkali nature of Portland cement) <br />limits the solubility of metals. As such, incorporating the materials from WU1 into floor slab and <br />pavement subgrades that will be treated with cement affords an even greater reduction of the <br />potential for leaching of soluble metals in these materials. Following the placement of the WU1 <br />materials beneath the building floor slab (and to a lesser degree beneath concrete pavements) and <br />the treatment of these materials with cement, the potential for leaching of metals from these <br />materials to groundwater is considered to be negligible. <br /> <br />Specific measures for the placement and cement treatment of the materials are presented below. <br /> <br /> <br />PROCEDURES OF REUSE OF WU1 MATERIALS <br /> <br />Notification <br /> <br />At least one week prior to the onset of construction activities at the site that involves the <br />relocation of the stockpiled materials from WU1 and the placement of these materials within <br />building pad and pavement subgrades, the SJCEHD, the CVRWQCB, and CalRecycle will be <br />notified of the work schedule. <br /> <br />Placement and Cement Treatment of WU1 Materials <br /> <br />All of the materials contained in the stockpiles of material removed from WU1 will be placed <br />within the upper one foot of the building pad subgrade for the proposed approximate 870,000 <br />square-foot concrete tilt up building planned to be constructed on the site. Materials placement <br />and compaction should conform to the requirements of project plans and specifications, <br />including the project Foundation Investigation prepared by Raney Geotechnical, Inc.; a copy of <br />the Foundation Investigation is included in Appendix B of this Workplan.6 <br /> <br />As described in the appended Foundation Investigation, the upper one foot of the building pad <br />subgrade will be treated with at least five percent Portland cement, as determined by dry unit <br />weight. The treated mixture will be moisture conditioned and compacted to at least 92 percent of <br />the maximum dry density as determined by the ASTM D1557-02 test procedure. <br /> <br />Any materials generated during trimming of the treated building pad to final grade, and all <br />materials generated during foundation and utility trench excavation within the upper one foot of <br />the building pad should be placed beneath areas adjoining the building that are designated to be <br />concrete paved. These materials will be placed within the upper one foot of the concrete <br />pavement subgrades and will subsequently be cement treated. The project Foundation <br />Investigation indicates that the pavement subgrades will be cement treated in a similar manner as <br />described above for the building pad subgrade. <br /> <br /> <br />6 Raney Geotechnical, Inc.; “Foundation Investigation, Murphy Parkway Warehouse, Murphy Parkway near D’Arcy <br />Parkway, Lathrop, California”; December 19, 2016.