Laserfiche WebLink
Step Instruction <br /> Product <br /> Tank Type <br />(DW FRP, DW Steel, SW FRP) <br />1 Annular Riser Height (measured) <br />2 Tank Diameter: (from tank chart, <br />for example: 118.375",117.75",111",92",etc.) <br />3 For FRP tanks, 1/2 circumference of the tank <br />(0.5 X 3.14 X tank diam.) OR (q.57 x step 2) <br />4 <br />Required annular sensor length: <br />FRP = Riser + 1/2 Circumference = step 1 + step 3 <br />Steel = Riser + diameter = step 1 + step 2 <br />5 <br />Mark & label the required sensor length on <br />sensor cord. Label should be under the cap & <br />serve to prevent the cord being pulled too short. <br />6 <br />Is tank annular sensor in the correct position? <br />FRP Tanks: with the marked required length <br />lining up with the top of the annular riser? <br />Steel Tanks: sensor touching bottom with slack <br />above the marked required sensor length? <br />8 <br />Are the DW pipe boots pulled back in tank sumps? <br />(Y/N or N/A, note if can't be verified because <br />clamshell pointing down) <br />9 <br />Are tank sump sensors back in their holders and <br />in the correct position? <br />(Y/N or N/A document with photo) <br />7 Approximate gallons of product dispensed for <br />purging, etc. and returned to tank <br /> T1 <br /> SUPREME <br /> Fiberglass <br /> <br /> 0.00 in. <br /> 0.00 in. <br /> 0.00 in. <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br /> <br /> T2 <br /> REGULAR <br /> Fiberglass <br /> <br /> 0.00 in. <br /> 0.00 in. <br /> 0.00 in. <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br /> <br /> T3: diesel <br /> Diesel <br /> Fiberglass <br /> <br /> 0.00 in. <br /> 0.00 in. <br /> 0.00 in. <br />Yes <br />Yes <br />Yes <br />Yes <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Chevron Monitoring Certification Checklist <br />Store Number: Address: 9484 West Lane Stockton, CA 95210 <br />Date: 2/11/2021 Technician: Jesus Saldivar Company: TANKNOLOGY INC. <br /> <br /> <br /> <br />Has the Veeder Root Battery been replaced & dated prior to failsafe? <br />(If battery backup failed, label and leave failed battery on top of console, note in comments and advise your OM) Replaced in Last 30 Days <br />Has Veeder Root Programming before & after testing been printed & verified? <br />(especially tank manifolding setup ‐ see Note 2) Yes <br />Has Veeder Root Programming before & after been attached to the Work Order? Yes <br />Have all sensor model numbers been verified against the Veeder Root cord label? <br />Make a note if sensor label missing or illegible, & approx. cord length for ‐208/‐209 with missing labels Yes <br />Additional Comments: <br />all tanks on site have 301 brine sensors <br />Note 1: Certain Veeder Root Software versions will automatically revert to the default tank manifold settings any time the programming is changed, such as when sensors are <br />temporarily X'ed out, etc.