My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 12:02:27 PM
Creation date
1/22/2021 2:13:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 7150 bver6FI Valu in Tank Shut aff k..aVal Worksheet w <br /> lmaortaltt:This if meantto br aupplementaI worksheet and not a xubstftute to folinwing the Installatlen Ln <br /> manual Imitructkvns.All length mwsuramcnts are in Indies. Please[antact the Authority Having]urisdic- 00 <br /> tion 1AM1 and review local,state,and national codes to datermine the regwiatory requkemerrts governing 00 <br /> shut-aff rapacity In your region,as wail as take into account other camxWeradnns such as oxtreme tank tilt. <br /> Take the fold c wi reg measurements with the va lve kir <br /> stalled In the ten k: <br /> Distence from She 71 Si7 inl+ttube flange to the cast <br /> iug In the 7l!�D body(see figures),upper tube length, <br /> Nater:the i.ipperTube I,englh musthe at least IS'to <br /> include t#,e protective bend In Ove tube_ <br /> Distance franc the 7150 int ettuhe Lange io the top and <br /> b❑ttomof lower tube,valve length. id1 <br /> (ik}= Upper <br /> tube <br /> >j[sfanee from the 71.5.7 inlet tube flange to the bottom <br /> ❑flwtank.k1.❑to.Ifatankbutwrnprmectw15present rt <br /> may be!necessaryto add this thickness to dimension <br /> (DPW 6111&61TP models add OA' Iwi valvas <br /> (a)= l tZngdf'' <br /> bottom <br /> Kram rhe tank c=alf b scion chart provided by tank rnantr c t <br /> factsu er find the d l p 5dck nu mbe r M which corrL sp❑nd 5 <br /> m the Io�vv1LLrp�e- fel <br /> SY3= <br /> f l N,5 7o Tank <br /> I� <br /> 1. To determine shut-off percentage. <br /> 5ubaact upper tune length(p)fram distance to W nk ful valor (Nsrt <br /> bottom 113) = LenS ol- <br /> 1V npof Cut um&DIpOn=IB}-(DI.7" <br /> stick <br /> Using thetank ealibratlon chart provided bythe tante <br /> mahufa[tutee datermint the tank rapacity at the cal- <br /> culated Oq dimension and the 10096 volume FY)tank <br /> capacity. <br /> {l1.}tank capacity in ga klans-_ � <br /> Mton kmpacity lttgallon s + 70 <br /> r (D <br /> 50% fX)eapacltyI(Y)capatttyx10v= # <br /> Nota;The rnerXll valve must be installed 4er AN regain <br /> j, menlsan!all appllcahle Sucal,dale,and national rode3-if r) <br /> the.over1tli vale is set above the g0awdabte shutbHoencent• O <br /> CT 4 �7 age the overfill Valve mint ne remuwed and replaced. Fat O <br /> rear nme 40 CFR pari 2aO Subpart 5$action 2n-2a 6v#6111 <br /> valves should be sec to a maximum of SSW O <br /> O <br /> F- <br /> � W <br /> Ul <br /> I fv <br /> 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.