My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:41:23 PM
Creation date
1/22/2021 2:21:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> Feach <br /> TED UNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT (Page 2 of 2) <br /> VII. INSPECTION HISTORY <br /> ow-up action of Section III from the previous inspection been completed appropriately? Y I N <br /> Attach documentation verifying appropriate service to this report. g) 1 ❑ <br /> VIII. . ALARM HISTORY <br /> Attach a copy of the alarm history re ordla to this report. Y N NA <br /> Is the monitorin2 system Rowered on and in proRer operating mode? ® ❑ ❑ <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? 1:1 El <br /> documentation verifying a Ya fate service to this report. <br /> Have all containment sumps that have had a leak detection alarm since the previous inspection been responded to by a ❑ ❑ <br /> ualified UST Service Technician? <br /> List below in Section IX all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br /> responded to by a qualified UST Service Technician.Containment sumps listed below require a visual inspection for damage,water,debris, <br /> hazardous substance and proper sensor location. The results of the visual ins tion must be recorded in Section IX. <br /> IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage,water, debris, and hazardous substance? <br /> Containment Sump ID Y N Containment Sump ID Y N <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> .Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage,water,debris,and hazardous substance? <br /> Tank ID Spill Bucket-87 East 87 West A'1 ❑ 1 Tank ID Spill Bucket-Diesel East $1 ❑ <br /> Tank ID Spill Bucket-91 Q9 ❑ Tank ID Spill Bucket-Diesel West ? ❑ <br /> Is the fill pipe free of obstructions? <br /> Tank ID 5pill BUCKet-51as , 51 West ❑ Tank ID b13111 tsucKet-uteselas ❑ <br /> Tank ID Spill Bucket-91 U9 ❑ Tank 1D Spill Bucket-Diesel West ❑ <br /> Is the fill cap securely on the fill pipe? <br /> Tank ID Spill Bucket-87 East, 87 West 31 ❑ I Tank ID Spill Bucket-Diesel East ❑ <br /> Tank ID $pill Bucket-91 991 ❑ I Tank ID I Spill Bucket-Diesel West ❑ <br /> Is the under-dispenser containment free of damage,water,debris, and hazardous substance? <br /> Under-Dispenser Containment ID Y N NA Under-Dispenser Containment ID Y N N <br /> Dispenser-1/2, ® ❑ pDispenser-23124, 5 ® ❑ ❑ <br /> Dispenser-5/6, 718 (2 ❑ ❑ Dispenser-25128,26127, 27 ❑ ❑ <br /> Dispenser-9/10, Qg ❑ ❑ ❑ ❑ ❑ <br /> Dispenser-1 ® p p ❑ ❑ ❑ <br /> Dispenser-17118, 19120 ® ❑ ❑ ❑ Cl ❑ <br /> Dispenser-21, 21122, 22123 P9 ❑ ❑ 1 ❑ ❑ ❑ <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? ® ❑ ❑ <br /> X. TESTING AND MAINTENANCE Y NINA Date Last <br /> Performed <br /> Has the monitoring system certification been completed within the past 12 months? ❑ 8/4/2020 <br /> Has the spill container testing been completed within the past 12 months? ❑ 8/4/2020 <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? ❑ ❑ 9/28/2018 <br /> Has the secondary containment testing been completed within the past 36 months? ® ❑ ❑ 12118/2019 <br /> Has the tank tightness testing been completed within required timeframes? ❑ ❑ ® NIA <br /> Has the line tightness testing been completed within the required timeframes? ® 1 01 ❑ <br /> Other required testing/maintenance was completed within required timeframe. (List test/maintenance items below.) 8/4/2020 <br /> Test 1 Maintenance: ❑ ❑ <br /> Test I Maintenance: ❑ ❑ <br /> Test 1 Maintenance: ❑ ❑ <br /> Test 1 Maintenance: ❑ ❑ <br /> Test 1 Maintenance: ❑ ❑ <br /> Test I Maintenance: 1 01 01 1 <br /> XI. FACILITY EMPLOYEE TRAINING JY N <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? ❑ <br /> 1 the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> Y=Yes,N =No,NA=Not Applical*,ID=klen%cation LOVES-223-08/24/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.