Laserfiche WebLink
Day of Week: Monday Tuesday Wednesday Thursday rid y satruday S d <br /> Date: —27 — 8 o . 29- - I <br /> Operator Initials: V3-C, <br /> EPA Method 22: Location 5th Level of Boiler Struttu <br /> Permit ID N-645-37-0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associatedcone rs. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 1 minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler structure: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N me Y/N Time Y/N T <br /> Tiime Y/N ITime Y/N Time Y/N ITime Y/N Time <br /> Conveyor"E" Conveyor"F° O6yMJO <br /> 9"J6 <br /> Overfeed Screw Conveyor"G" N �.?� Al <br /> Conveyor"G" Conveyor"F"Conveyor"F" Boiler drag ChainSouth Fuel Yard Ground 0710Fly Asn s los, Visible Dust? d ry �Y <br /> Hazardous Waste Above ground Storage Tank Inspection Maintain Daily Inspections For Three Years/Req: 22CCR s66265.195 <br /> Day of Week: Monday Tuesday Wednesday Thursday F iday Saturday Sunday <br /> Date: - o - 8-U/ 7•-29 o 7- - /- Zo - <br /> Inspectors initials: <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in (� V <br /> good working order? (If applicable) i <br /> 2)Are all above ground portions of the tank `/ Y <br /> free of corrosion or realease of any waste? 7 <br /> 3)Is there indication of release of any waste? <br /> 4)Any flyash escaping from silos or loading area? ►�/ /�/ <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= #2= <br /> Date: <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />