Laserfiche WebLink
Day of Week: Monday Tuesday Wednesday Thursday Friday Satruday Sunday <br /> Date: r /9•Zo 6 v6 •Zo .i 7.L - QS2 Vi-2 0 6 -2\- O <br /> Operator Initials: <br /> EPA Method 22: Location Sth Level of Boiler Structure. <br /> Permit ID N-645-37-0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associated conveyors. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast i minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler Structure: Monday Tuesday I Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N ITime Y/N Time Y/N ITime Y/N ITime Y/N Time Y/N ITime Y/N ITime <br /> Conveyor"E" Conveyor"F" //-V /V /0, 1a i6'/-s OOf) 1010 N wm <br /> Overfeed Screw Conveyor"G" r✓ oo N !a 30 /o VS (\ 6 O <br /> Conveyor"G" Conveyor"F" AJi/m w l63a At/ /o Yr /1') <br /> Conveyor"F" Boiler drag Chain //aoAl /03o n/ /oys p <br /> South Fuel Yard Ground ✓ //ao XL/ /a3o sJ io ys- Q20A 1030Aj L 02 <br /> Fly Ash Silos, Visible Dust? �v I//oe /1i aPo o./ ,e vs NOM 10 08 2 <br /> Hazardous Waste Above ground Storage Tank Inspection I Maintain Daily Inspections For Three Years/Req: 22CCR x66265.195 <br /> Day of Week: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Date: 6 •/S, _; 6•/s• / •/ zo o- - l- <br /> Inspectors initials: �� / <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in <br /> good working order? (If applicable) <br /> 2)Are all above ground portions of the tank 1 ) <br /> free of corrosion or realease of any waste? >1 <br /> 3)Is there indication of release of any waste? /�/ N /✓ A/ <br /> 4)Any flyash escaping from silos or loading area? a/ �✓ <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= #2= I. Date: <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />