Laserfiche WebLink
Day of Week: Monday I Tuesday I Wednesday I Thursday Friday Satruday Sunday <br /> Date: G-1 -Lf 1 6 - 2-ZO - - <br /> Operator Initials: I op It <br /> EPA Method 22: Location 5th Leve=ofiler Structu <br /> Permit ID N-645-37-0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associated conveyo s. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 1 minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler structure: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time <br /> Conveyor"E" Conveyor"F" & ` <br /> Overfeed Screw Conveyor"G" Al CW6 0 <br /> Conveyor"G" Conveyor"F" <br /> Conveyor"F" Boiler drag Chain T 77 G <br /> South Fuel Yard Ground 072o I & NtS l� <br /> Fly Ash Silos, Visible Dust? IVO `/ .( a <br /> Hazardous Waste Above ground Storage Tank Inspection Maintain Daily Inspections For Three Years/Req: 22CCR s66265.195 <br /> Day of Week: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Date: -/-Z o 2.2D <br /> Inspectors initials: <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in 7 <br /> good working order? (If applicable) <br /> 2)Are all above ground portions of the tank <br /> free of corrosion or realease of any waste? <br /> 3)Is there indication of release of any waste? <br /> 4)Any flyash escaping from silos or loading area? U <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= #2= Date: <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />