Laserfiche WebLink
Day of Week: Monday Tuesday Wednesday I Thursday Friday Satruday Sunday <br /> Date: \\'ZO -\2-2D -\ —Z6 I r -15 -zaS '>6za <br /> Operator Initials: C <br /> EPA Method 22: Location 5th Level of Boiler Structure. <br /> Permit ID N-645-37.0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associated conveyors. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 1 minute,and look for visible dsust missions. <br /> 4.)Mark"M'for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler Structure: Monday Tuesday I Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N ITime Y/N Time Y/N ITime Y/N ITime Y/N ITime Y/N Time Y/N Time <br /> Conveyor"E" Conveyor"F" 1000 20 Q io �/ crs'L. n/ /006 <br /> Overfeed Screw Conveyor"G" 9/0 .✓ B zo w ,OOo <br /> Conveyor"G" Conveyor"F' Octqo /v ',0 ed l$' .o: A/ <br /> Conveyor"F" Boiler drag Chain t r yO 91d ti 6'ZO „/ <br /> South Fuel Yard Ground t070 4150 4t4 /✓ Y/6 ,K/ SLo s/ <br /> Fly Ash Silos, Visible Dust? (02 !1 5 A CIA501 <br /> Hazardous Waste Above ground Storage Tank Inspection Maintain Daily Inspections For Three Years/Req: 22CCR s66265.195 <br /> Day of Week: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Date: •1\•?1] -\Z10 p 5✓Y-T� /SZ S /6 •zu <br /> Inspectors initials: <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in r ' r`-() <br /> good working order? (If applicable) `-( <br /> 2)Are all above ground portions of the tank <br /> free of corrosion or realease of any waste? (] <br /> 3)Is there indication of release of any waste? 0lt✓ s'✓ <br /> 4)Any flyash escaping from silos or loading area? ,v /'✓ Al <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= #2= Date: <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />