Laserfiche WebLink
Day of Week: Monday Tuesday Wednesday Thursday Friday Satruday Sunday <br /> Date: C{—/3- - -(5,20 A/ /6 Zo /-/7Lc Y /ff Lo 1E---Zo <br /> Operator Initials: as <br /> EPA Method 22: Location 5th Level of Boiler Structure. <br /> Permit ID N-645-37.0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associated conveyors. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 1 minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler Structure: Monday Tuesday I Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N ITime Y/N Time Y/N ITime Y/N Time Y/N Time Y/N Time Y/N ITime <br /> Conveyor"E" Conveyor"F" int000 4 10 r✓ /oma ,U 1615 /0.3d nJ /o&o <br /> Overfeed Screw Conveyor"G" wo q15 Al ze7a6 /oa /+/ ro3o /v Ivo <br /> Conveyor"G" Conveyor"F" 70 /✓ 1615 /03a N eGc. <br /> Conveyor"F" Boiler drag Chain In Al, KS6 C4 15 N <br /> South Fuel Yard Groundp .Sd p �tl roto N ro/r /✓ /036 /./ rar.- <br /> FlyAshSilos, Visible Dust? IVc( N /uw N ra/s n/ io3c :✓ row <br /> Hazardous Waste Above ground Storage Tank Inspection Maintain Daily Inspections For Three Years/Req: 22CCR s66265.195 <br /> Day of Week: Monday Tu sda Wednesday Thursday Friday Saturday Sunday <br /> Date: Z1-1S-Z0 / -(5tc Y,/C'-Z- 2L7zo ./ 57.z p Yz 9.Zf. <br /> Inspectors initials: <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in Y <br /> good working order? (If applicable) 1 y c <br /> 2)Are all above ground portions of the tank <br /> free of corrosion or realease of any waste? <br /> 3)Is there indication of release of any waste? /( /✓ <br /> 4)Any flyash escaping from silos or loading area? /L <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= #2= Date: <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note: In the time column put TIME OF DAY. <br /> Page 7 <br />