Laserfiche WebLink
( ( t <br /> Day of Week: Monday I Tuesday I Wednesday I Thursday Friday Satruday Sunday <br /> Date: Q. — — IV 3-20 4i - -S Z-6, <br /> Operator Initials: VA-C <br /> EPA Method 22: Location 5th Level of Boiler Structure. <br /> Permit ID N-645-37.0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associated conveyors. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 1 minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler Structure: MonJdauesday Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N Time Y/N Time Y/N Time Y/NTime Y/N Time Y/N Time <br /> Conveyor"E" Conveyor"F" N 4 d N O OD /0 edOverfeed Screw Conveyor"G" Q U Gd /WConveyor"G" Conveyor"F" N0 r ( 0 /O 0Conveyor"F" Boiler drag Chain Q$$ 130 / GSouth Fuel Yard Ground /GFly Ash Silos, Visible Dust? 000 ( 0 / <br /> Hazardous Waste Above ground Storage Tank Inspection Maintain Daily Inspections For Three Years/Req: 22CCR s66265.195 <br /> Day of Week: Monday Tuesday WednesdayIday Fr' ay Sa r y Sunday <br /> Date: t �hc <br /> Inspectors initials: L 2 ( 'r/ I p�-U <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in <br /> good working order? (If applicable) <br /> 2)Are all above ground portions of the tank <br /> free of corrosion or realease of any waste? <br /> 3)Is there indication of release of any waste? <br /> 4)Any flyash escaping from silos or loading area? <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= #2= Date: <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />