Laserfiche WebLink
Day of Week: Monday I Tuesday I Wednesday Thursday Friday Sa ud y S nda <br /> Date: 3 9 Z 3 /c z o I3•i i z a 3-1t• �i ` <br /> Operator Initials: I /� I c , <br /> EPA Method 22: Location 5th Level of Boiler Structure. <br /> Permit ID N-645-37-0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other assoc ated conveyors. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 1 minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler Structure: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N ITime Y/N Time Y/N ITIme Y/N ITime Y/N Time Y/N Time Y/N Time <br /> Conveyor"E" Conveyor"F' IIJ 11-alS t^1 ion, d✓ /a z•• A 1630129 9 <br /> Overfeed Screw Conveyor"G" it/ /Oir y/ ?000 ry .v: A 1036 1 & •fid <br /> Conveyor"G" Conveyor"F" n/ I /V/.r rt Jcoo 0 <br /> Conveyor"F" Boiler drag Chain /v I /O's n/ 10 <br /> South Fuel Yard Ground I rocsI /oen 10 0 Q•l <br /> Fly Ash Silos, Visible Dust? /moi r N %�' :✓ /o z c (I loz I •I <br /> Hazardous Waste Above ground Storage Tank Inspection Maintain Daily Inspections For Three Years/Req: 22CCR s66265.195 <br /> Day of Week: Monday Tuesday Wednesday Thursday Friday SatArdily, S nda <br /> Date: 3.q L c 3•10 Z c� 3 0 z c, <br /> Inspectors initials: rEr <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in <br /> good working order? (If applicable) <br /> 2)Are all above ground portions of the tank J <br /> free of corrosion or realease of any waste? `/ Y r <br /> 3)Is there indication of release of any waste? i/ n/ /l <br /> 4)Any flyash escaping from silos or loading area? ti ti x /t <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= 2• 0, #2= *e - <br /> Tank <br /> must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />