My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2200 - Hazardous Waste Program
>
PR0514248
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2023 2:47:11 PM
Creation date
1/25/2021 11:19:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0514248
PE
2294
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( C <br /> Day of Week: Monday I Tuesday I Wednesday I Thursday Friday Sa:t:ru:day Sunday <br /> Date: -7-g2!) 1 ,•�z v. 2v - ,7:122 IL3f• 20 L r l� <br /> Operator Initials: I -IL <br /> EPA Method 22: Location Sth Level of Boiler Structure. <br /> Permit ID N-645-37-0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associated conveyors. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 1 minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler Structure: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N ITime Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time Y/N Time <br /> Conveyor"E" Conveyor"F" 106 Opo /%/ toy- loo 0 /✓ to 30 2zo <br /> Overfeed Screw Conveyor"G" ry 11 IZ5- (bpp /c>_?0 IMO /eyJ 6730 <br /> Conveyor"G" Conveyor"F" / 0 Al lolt 000 Al rovs 1)7 30 TqW <br /> Conveyor"F" Boiler drag Chain 00 id iO so I C'00 /t/ /1)+%r p IV Qks_ <br /> South Fuel Yard Ground (5 w iO3" 15 Al /0".r 0? 0 OgL5 <br /> Fly Ash Silos, Visible Dust? (0I 14 163,1 )CA 5 ,f/ t'Yr O tvJ D055 <br /> Hazardous Waste Above ground Storage Tank Inspection I Maintain Daily Inspections For Three Years/Req: 22CCR x66265.195 <br /> Day of Week: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Date: I' J-2o �- 20 /.Z . . z1) -� -Z(T /• /•20 I - ago -2-107h <br /> Inspectors initials: <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in C <br /> good working order? (If applicable) / <br /> 2)Are all above ground portions of the tank <br /> free of corrosion or realease of any waste? �� <br /> 3)Is there indication of release of any waste? A4 ,1V 7✓ N <br /> 4)Any flyash escaping from silos or loading area? ,t/ <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= '� #2= a- Date: <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.