My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2200 - Hazardous Waste Program
>
PR0514248
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2023 2:47:11 PM
Creation date
1/25/2021 11:19:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0514248
PE
2294
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(15) SB 14 hazardous waste processed onsite in a <br /> wastewater pretreatment unit for discharge to POTW or <br /> NPDES permit (Category A*) Total: 0 lbs <br /> (16) All other SB 14 hazardous waste (Category B*) 47,916,000 lbs 1, <br /> (17) All extremely hazardous waste 0 lbs <br /> * Category A was previously referred to as aqueous waste. Category B was previousl, <br /> as nonaqueous waste. <br /> (18) COMMENTS regarding hazardous waste source reduction and recycling activitie <br /> if needed). <br /> Concerning the major waste streams from the Baseline Year, MPCC experienced both increases and d <br /> waste. MPCC frequently experiences variation of the quality of woody biomass it receives,thus impar <br /> amount of bed ash and fly ash which can be reused or considered not hazardous.The facility has also <br /> operational changes and increased housekeeping in recent years.The facility has developed and cont <br /> maintain an Ash Management Plan. MPCC will continue to look into source reduction measures that c <br /> product quality. <br /> Please continue by clicking on the "Table 2" tab below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.