Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMP/UDC TEST <br />Test Method Developed by E] Manufacturer © Industry Standard rj Professional Engineer <br />Test Type ® Pressure El Vacuum Ej Hydrostatic <br />Test Equipment Used: Caldwell Tester <br />Sump1UDC ID 5/6 <br />Sump Manufacturer Bravo <br />Sump Depth (inches) 12 inches <br />Sump Bottom to Top of <br />8 inches <br />Initial Reading <br />9 inches <br />Test End Time <br />Highest Pipe Penetration <br />Final Reading <br />9 inches <br />Change in Reading <br />0 <br />(inches) <br />0 <br />Tightness Test Results <br />FM Pass ® Fail <br />Test Start Time <br />0 mins <br />Initial Reading <br />9 inches <br />Test End Time <br />60 mins <br />Final Reading <br />9 inches <br />Change in Reading <br />0 <br />Pass/Fail Criteria <br />0 <br />Tightness Test Results <br />FM Pass ® Fail <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Pass In Fail I If -I Pass 111 Fail I [r] Pass F Fail <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />Pass ® Fail I F] Pass F] Fail I [] Pass El Fail I I[] Pass LI Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />