Laserfiche WebLink
S A N J D AR I N Environmental Health Department <br /> TUU ;,�j i y <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> DAMERON HOSPITAL 525 W ACACIA ST, STOCKTON February 05, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 210 CCR 2715(c)Failure to provide initial training,train every 12 months, and have a trained employee present. <br /> OBSERVATION: The designated operator employee training for 2020 was not on site. The last training certificate <br /> was 2/13/2019. <br /> REGULATION GUIDANCE: The designated operator shall train facility employees in the proper operation and <br /> maintenance of the UST system at least once every 12 months. The training shall be conducted before the <br /> individual performs the duties of a facility employees.The training shall include, but is not limited to: <br /> 1. Operation of the UST system in a manner consistent with the facility's best management practices <br /> 2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br /> 3. Employee's role with regard to spills and overfills as specified in the facility's response plan <br /> 4. Name of the contact person(s)for emergencies and monitoring equipment alarms <br /> Initial training shall also include a site-specific practical demonstration that provides both sharing information and <br /> evaluating knowledge for responding to emergencies, leak detection, monitoring alarms, spills and overfills. At least <br /> one of the facility employees present during operating hours shall have current training. <br /> CORRECTIVE ACTION: Ensure that employees have been trained by the designated operator annually and <br /> maintain the list on site.The employees were trained today 2/5/2021. <br /> This is a Class II violation. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by 3/7/2021 . <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead <br /> of having them sign. Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate <br /> ($152). To schedule an appointment, please call (209)468-3420. <br /> Documents provided during inspection: Return to Compliance Certification and Corrective Action Statement <br /> form, list of free CUPA Classes, blank Certificate of Financial Responsibility, blank Facility Employee Training <br /> Certificate <br /> Felix Ramirez: <br /> Petro Tite Line Testing 9/8/2021 <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: February 05, 2021 Inspector: Inspector Phone: <br /> Printed Name and Title: CAROL PRESTO, EHS Trainee (209)616-3061 <br /> Alesha Long,Admin.Asst. Plant Operations <br /> FA0002864 PR0231002 SCO01 02/05/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 5 of 5 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />