My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 11:46:08 AM
Creation date
1/27/2021 2:12:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) Tl Unleaded T1 Unleaded T2 Unleaded T3 Premium <br /> Are both vent and tank riser piping V/ Yes A Yes A Yes f Yes <br /> secondarily contained? No 7No 7No No <br /> OPE Model Veeder Root Veeder Root Veeder Root Veeder Root <br /> What is the OPE response when activated? Shut off -1 Shut off Shut off Shut off <br /> (Check all that apply.) Flow Flow w Flow <br /> estricts estrictsbZtricts Restricts <br /> Flow Flow Flow Flow <br /> V Audible v/ Audible v/ Audible ✓ Audible <br /> Alarm Alarm Alarm Alarm <br /> r/ Visual :V/ Visual Visual r/ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes* Yes* Yes* <br /> that may interfere with the OPE operation? 17 No 7,( No Hv No �/ No <br /> At what level in the tank is the OPE set to 98 114 971/2 975/8 891/2 <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 9() 90 gp 90 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to �/ Yes �/ Yes �/ Yes �/ Yes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results �Pass �/ Pass r/ Pass f Pass <br /> Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> Lj Flow restrictors interfere with ovefll prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.