Laserfiche WebLink
WAO <br /> E��n <br /> both the 08/04/2020 and 09/04/2020 Designated Operator Inspections have been attached for your <br /> reference. <br /> Item 4: On your inspection report you noted that an approved copy of the response plan was not <br /> onsite. You requested that the response plan from the 2021 CERS submittal be placed onsite. <br /> Resolution 4: The Regional Environmental Compliance Specialist verified that current response plan <br /> form was onsite on 03/01/2021 <br /> This letter should address the item(s) noted on the Inspection Report. 7-Eleven assumes that all issues <br /> regarding this report have been resolved and are closed at this time. The submittal of this response by <br /> 7-Eleven, Inc. shall not constitute, nor be deemed to constitute, an admission of liability or responsibility <br /> with respect to the alleged violations and may not be used in any administrative or judicial proceeding <br /> or otherwise. <br /> Very truly yours, <br /> 7-Eleven, Inc. <br /> Ethan Valburg <br /> Regional Gasoline Environmental Compliance Specialist <br /> Enclosures: Designated Operator inspections,Test report and supporting documentation <br /> cc: File <br /> 7-Eleven,Inc. <br /> P.O.Box 711—Dallas,Texas 75221-0711 <br />