My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 10:22:01 AM
Creation date
1/27/2021 4:19:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> T1: <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping Yes r, Yes r Yes Yes <br /> secondarily contained? r No No r No r No <br /> OPE Model oPw <br /> V Shut off Shut off Shut off Shut off <br /> Flow Flow Flow Flow <br /> Restricts ! Restricts ! Restricts ! Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) Audible ' Audible ' Audible ' Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual ! Visual ! Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? No No r No r No <br /> At what level in the tank is the OPE set to 103.625 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 94.3 <br /> Is the OPE in proper operating condition to Yes Yes Yes r Yes <br /> respond when the stored substance reaches No No No No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> Pass Pass Pass r Pass <br /> OPE Inspection Results Fail c Fail Fail r Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> *Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.