My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 10:22:01 AM
Creation date
1/27/2021 4:19:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71SO-TOOLC PROCEDURE BELOW, Caution: If the drill stop is not in the proper <br /> FOR 71SO-TOOL, SEE PAGE 8 location failure of a pressure decay leak test may <br /> result. <br /> STEP 913: INSERT 71SO-TOOLC OVER INLET 71 SO-TOOLC <br /> TUBE <br /> To install the 71 SO-TOOLC (sold separately) over <br /> the inlet tube, first loosen the thumb screw, so the o <br /> tool can pass freely over the inlet tube flange. Align <br /> the slot on the tool with the key on the inlet tube and <br /> insert the tool down. See Figure 9B. <br /> Tool Slot Hand tighten thumb Tip to stop dimension <br /> o _-------- screw must be 1-3/16" to 1-1/4" <br /> 0 0 <br /> / o o Figure 11 B <br /> Loosen <br /> thumb <br /> screw 0 STEP 1213: DRILL HOLES <br /> With the inlet tube and 71 SO-TOOLC in place, <br /> Inlet carefully drill a 3/16"diameter hole in the upper tube <br /> Tube using the hole in the 71SO-TOOLC as a guide. The <br /> Key drill stop is positioned so it will bottom out against <br /> the tool after the bit has drilled through the upper <br /> drop tube. If the stop is positioned wrong either no <br /> hole will be drilled, or a through hole could <br /> potentially be drilled through the inlet tube. If no <br /> hole is drilled return to step 11 and check the stop <br /> dimension. If a hole is drilled through the inlet tube <br /> or into the screw hole the assembly is not <br /> salvageable. Drill (2) more holes in the two <br /> Figure 9 Figure 10 remaining guide holes. <br /> STEP 1013: TIGHTEN THE 71SO-TOOLC o <br /> Ensure that the tool seats flat against the top of the <�> o <br /> inlet tube. To prevent vertical movement of the tool <br /> during drilling, hand tighten the thumb screw against <br /> the upper drop tube. See Figure 1013. <br /> STEP 11 B: PREPARE DRILL AND BIT <br /> Confirm that the stop on the 3/16" drill bit supplied Drill through upper tube only <br /> with the 71SO-TOOLC is in the correct position <br /> before drilling. The stop is factory installed at a <br /> distance between 1-3/16"to 1-1/4"from the tip with <br /> the 71 SO-TOOLC. If the stop is not at the correct Figure 1213 <br /> position it must be fixed before drilling. <br /> 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.