My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 10:22:01 AM
Creation date
1/27/2021 4:19:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> DESIGNATED UNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT (Page 2 of 2) <br /> VII. INSPECTION HISTORY <br /> Has each follow-up action of Section III from the previous inspection been completed appropriately? Y I N <br /> Attach documentation verifying appropriate service to this report. ® ❑ <br /> VIII. . ALARM HISTORY <br /> Attach a copy of the alarm histo report/fogreportliog to this report. Y N NA <br /> Is the monitoring system powered on and in proper operating mode? ® ❑ ❑ <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? 50 ❑ ❑ <br /> Attach documentation verifying appropriate service to this report. <br /> Have all containment sumps that have had a leak detection alarm since the previous inspection been responded to by a ❑ ❑ <br /> qualified UST Service Technician? <br /> List below in Section IX all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br /> responded to by a qualified UST Service Technician.Containment sumps listed below require a visual inspection for damage,water,debris, <br /> hazardous substance and amper sensor location. The results of the visual ins tion must be recorded in Section 1X. <br /> IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> is the containment sump free of damage, water, debris,and hazardous substance? <br /> Containment Sump ID Y N Containment Sum ID Y N <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage, water, debris,and hazardous substance? <br /> Tank ID Sill Bucket-87 f$ ❑ Tank ID I Spill Bucket-DIESEL �I ❑ <br /> Tank ID $ ill Bucket-91 01 Tank ID I I ❑I ❑ <br /> Is the fill pipe free of obstructions? <br /> Tank ID tipill BUc e ❑ Tank ID Spill Bucket-DIESEL ❑ <br /> Tank ID Spill Bucket-91 I ®1 01 Tank ID 01 ❑ <br /> Is the fill cap securely on the fill pipe? <br /> Tank ID Spill Bucket-87 21 01 Tank ID Spill Bucket-DIESEL ❑ <br /> Tank ID Spill Bucket-91 091 ❑ I Tank ID ❑ ❑ <br /> Is the under-dispenser containment free of damac e, water,debris, and hazardous substance? <br /> Under-Dispenser Containment ID Y N I NAI Under-Dispenser Containment ID Y N N <br /> Dispenser-172 N1 ❑ ❑ ❑ ❑ ❑ <br /> Dispenser-3l4 Id ❑ ❑ ❑ ❑ ❑ <br /> Dispenser-5/113 99 ❑ ❑ ❑ ❑ ❑ <br /> Dispenser-7/8 ® ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> Cl ❑ ❑ ❑ ❑ ❑ <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? ® ❑ ❑ <br /> X. TESTING AND MAINTENANCE Y N NA Date Last <br /> Performed <br /> Has the monitoring system certification been completed within the past 12 months? 29 ❑ 216120 <br /> Has the spill container testing been completed within the past 12 months? pg ❑ 216120 <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? N ❑ ❑ 3113119 <br /> Has the secondary containment testing been completed within the past 36 months? ® ❑ ❑ 8/5120 <br /> Has the tank tightness testing been completed within required timeframes? ❑ ❑ ® NIA <br /> Has the line tightness testing been completed within the required timeframes? ❑ ❑ ® WA <br /> Other required testing/maintenance was completed within required timeframe. (List test/maintenance items below.) <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test 1 Maintenance: ❑ ❑ <br /> Test I Maintenance: 1 01 ❑ <br /> XI. FACILITY EMPLOYEE TRAINING Y N <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? ❑ <br /> 1 the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> Y=Yes,N =No,NA=Not Applicable,10=Identification 7-11 -35355-08/11/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.