My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 10:22:01 AM
Creation date
1/27/2021 4:19:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jfgTanknojogy Testing and Inspection Certificate <br /> Tanknology Inc. <br /> 11000 North MoPac Expressway,Suite 500,Austin,TX 78759 <br /> 800-800-4633 www.tanknology.com Page 1 of 1 <br /> Test Date 8/5/2020' Tanknology WO# NW 1-2346068 <br /> Test Purpose COMPLIANCE Customer PO# <br /> Customer Location <br /> 7-ELEVEN, INC. 7 ELEVEN 35355 <br /> P.O.BOX 711 3202 W HAMMER LANE(N-136) <br /> DALLAS,TX 75221 STOCKTON,CA 95209 <br /> Attn:ENVIRONMENTAL DEPARTMENT Attn:MANAGER <br /> (972)828-7575 (209)951-3345 <br /> Test/Inspection Description Item Tested Date Result <br /> Tesbed <br /> Tank Interstitial 1: 8/5/2020 Pass <br /> Tank Interstitial 2: 8/5/2020 Pass <br /> Tank Interstitial 3:Diesel 8/5/2020 Pass <br /> Secondary Pipe(Interstitial) Tank T1:-RUL STP Containment 1 to 112,3/4,516,718 8/5/2020 Pass <br /> Secondary Pipe(Interstitial) Tank T2:-PUL STP Containment 1 to 1/2,3/4,5/6,7/8 8/5/2020 Pass <br /> Secondary Pipe(Interstitial) Tank T3:-Diesel STP Containment 1 to 516,7/8 8/5/2020 Pass <br /> Piping Containment Sump Tank T1:-STP Sump 1 RUL 8/5/2020 Pass <br /> Piping Containment Sump Tank T2:-STP Sump 1 PUL 8/5/2020 Pass <br /> Piping Containment Sump Tank T3:-STP Sump 1 Diesel 8/5/2020 Pass <br /> Dispenser Containment (UDC) See test report for details 8/5/2020 Pass <br /> Tanknology Representative: Rosa Ortiz Technician: Jarrod Cooke <br /> Telephone: Technician Certification: (See forms) <br />
The URL can be used to link to this page
Your browser does not support the video tag.