Major Site Review (SR21-02), S00013836 Page 2 of 2 <br />744 K Jack Tone Road, Ripon <br />• Additionally, an EHD UST permit to operate is required once the approved UST system is <br />installed. <br />e. Storage of at least 1,320 gallons of petroleum aboveground or any amount of petroleum stored <br />below grade in a vault — Aboveground Petroleum Storage Program (HSC Sections 25270.6 <br />& 25270 et sec.) <br />• Spill Prevention, Countermeasures and Control (SPCC) Plan requirement <br />fI Threshold quanes of regulated substances stored onsite -California Accidental Release <br />Prevention (CaIARP) Program (Title 19, Section 2735.4 & HSC Section 25531 et sec.) <br />• Risk Management Plan requirement for covered processes <br />