Laserfiche WebLink
A NJ O A Q U l N Environmental Health Department <br /> COUNTY— <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> STOCKTON MOBIL 2 3440 E MAIN ST, STOCKTON February 09, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 107 HSC 25292.2; CCR 2711(a)(11)Failure to submit and maintain complete and current financial responsibility <br /> documents. <br /> OBSERVATION: Current financial responsibility documents were not found on site. The financial responsibility <br /> documents on site were dated 10/21/2019. <br /> REGULATION GUIDANCE:A copy of current financial responsibility documents are required to be maintained on <br /> site. <br /> CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br /> copy on site. <br /> This is a repeat violation, Class II. <br /> 115 CCR 2638(c), 2638(d) Failure to submit"Monitoring System Certification Form"within 30 days of completion of the <br /> test. <br /> OBSERVATION:Annual monitoring system certification, leak detector testing, and spill container testing was <br /> performed on 2/25/2020 and a test report was submitted on 5/29/2020, 3 months late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> This is a Class II violation. <br /> 122 CCR 2712(f) Failure to implement corrections and submit written response within 30 days of receiving the report. <br /> OBSERVATION:An inspection was last done on 2/25/2020 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 3/26/2020. This information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This is a Class II violation. <br /> FA0006423 PR0231173 SCO01 02/09/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 5 of 7 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />