My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
34243
>
2300 - Underground Storage Tank Program
>
PR0231801
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 8:35:05 AM
Creation date
1/29/2021 3:18:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231801
PE
2361
FACILITY_ID
FA0003290
FACILITY_NAME
COUNTRY MART GAS & FOOD
STREET_NUMBER
34243
Direction
S
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25318004
CURRENT_STATUS
01
SITE_LOCATION
34243 S CHRISMAN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/�, � "i- Production 5oluilons <br /> Bonder , Bins I Key Production S-Iwk— <br /> ainin,• has suceessfulll' contplcted <br /> Ig as set leech in the NOV assb�+ has successfully completed <br /> Quality Installation Program for the install tUon Of'( L.listedhas <br /> 1 o r <br /> and secondary containment products. <br /> c NO\% I=iber Glass Slstem,' fotnl <br /> �/ Quality Installation Program for the installation of UL listed prnnr <br /> ay <br /> -+Ked Thread IIA U1 OLCXQ and secondary containment products. <br /> Primary and Secondary Containment Systems -a-'/y / 1 <br /> Date Red Thread IIA 30001-11 000l,CX _J02 I j <br /> Rene"',ri oI the bonder Iraining is recummendcd <br /> or when the bonding Primary and Secondary Containment 5Ystems Date <br /> g process has not been practiced for n cry three years <br /> Period of 6 months. Renewal of the bonder training is recommended every three years <br /> or when the bonding process has not been practiced for a period of 6 months. <br /> SR0083263 �Mpm MENT (2) 6/10/2021 34243 Chrisman Rd Tracy, CA 95304 <br /> Fiber yStO S I odu ttan& <br /> ProductfmrSolutionsCompletion <br /> �'P deh1CL has successfully completedFiber Glass <br /> SystemsI P oduction SOIutiow, <br /> Bonder Training as set forth in the NOV Fiber Glass Systems'Total ��Qh' O(4- BLW k,.ehas successfully completed <br /> Quality Installation Program for the installation of UL listed primary Bonder Training as set forth in the NOV Fiber Glass Systems-Dotal <br /> and secondary containment products. Quality Installation Program for the installation of UL listed primary <br /> �� ,�, // and secondary containment products. <br /> akcd Thread IIA 1:7�30001-a'1000L,CX // ,;.,,, ,� <br /> Primary and Secondary Containment Systems <br /> ,�-,,Date l�Red Thread IIA C-1�(000L 1�3000LCX <br /> Primary and Secondary Containment Systems Date <br /> Renewal of the bonder training is recommended every three years <br /> or when the bonding process has not been practiced fora period of 6 months. Renewal of the bonder training is recommended every three years <br /> or when the bonding process has not been practiced for a period of 6 months. <br /> Fiber Iasi Systems I Gass <br /> Completion ibex Systems I ,F Completion& <br /> Production Solutions Y Production Solutions <br /> - 4AQJOI ,�1/1K (r i0q,-L has successfully completed �Q4 r� 01aS 11th'-5 has successful)}' completed <br /> Bonder Training as set forth in the NOV Fiber Glass Systems' Bonder Training as set forth in the NOV Fiber Glass Systems"focal <br /> Quality Installation Program for the installation of UL listed primary Quality Installation Program for the installation of UL listed primary <br /> and secondary containmentproducts. and secondary containment products. <br /> lJRed Thread IIA 2-30'001- 00LCX � &-Red Thread IIA 2-3(')`001-L:13000LCX <br /> Primary and Secondary Containment Systems Date Primary and Secondary Containment Systems Date <br /> Renewal of the bonder training is recommended every three years Renewal of the bonder training is recommended every three years <br /> or when the bonding process has not been practiced for a period of 6 months. <br /> or when the bonding process has not been practiced for a period of 6 months. <br /> ComSystemsi�+�+r GIG .�. SystemsI 1� P oductionnSolutions Fiber Glass Systems I PrductionSolutions <br /> �i Chat Venna"-J has successfully completed 5i m0Cis if'U�l has successfully completed <br /> Bonder Training as set forth in the NOV Fiber Glass Systems'Total Bonder Training as set forth Ili the NOV Fiber Glass Systems'Total <br /> Quality Installation Program for the installation of UL listed primary Quality Installation Program for the installation of Llt,listed primary <br /> and secondary containment products. <br /> andsecondary containment products. <br /> I�IZed Thread IIA 2-30001-1t13OOOLCX U Red Thread IIA EYe1000L U3000LCX <br /> Primary and Secondary Containment Systems Date Primary and Secondary Containment Systems <br /> Renewal of the bonder training is recommended every three years Renewal of the bonder training is recommended every three years <br /> or when the bonding process has not been practiced for a period of 6 months. or when the bonding process has not been practiced for a period of 6 months. <br /> Fiber lass �y�s �y�� I P y Complotion& Fiber Glass Systems I P duetionSolutions <br /> YP Produetion Solutions �!� �^ <br /> has successfully completed aia t"t>,-Zet� has successful) completed <br /> Chh S �cL�S y' 1 <br /> Bonder Training as set fort�i in the NOV Fiber Glass Systems'Tota) Bonder Tr ' ing as set forth in the NOV Fiber Glass Systems"Dotal <br /> ; Quality Installation Program for the installation of UL listed primary. <br /> Quality Installation Program for the installation of UL listed primary and secondary containment products. <br /> and secondary containment products. p <br /> l7Rcd`Thread IIA tJ30()0L�I3000LCX oc �� 'moi<ed Thread IIA 1Sa000L ls'3000LCX <br /> Primary and Secondary Containment Systems Date Primary and Secondary Containment Systems Uate <br /> Renewal of the bonder training is recommended every Ihrcc years <br /> Renewal of the bonder training is recommended every three years <br /> or when the bonding process has not been practiced for a period of 6 months. or when the bonding process has not been practiced for a period of 6 months. <br />
The URL can be used to link to this page
Your browser does not support the video tag.