Laserfiche WebLink
SR0083263 Amended <br /> Primary Underground Storage Tank <br /> SaGamda Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer 1.] Industry Standard [I Professional Engineer <br /> Test Type Ej Pressure ❑ Vacuum Hydrostatic <br /> Test Equipment Used: <br /> Tank ID Diesel <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Start Time 2:00 PM <br /> Initial Reading 45 PSI <br /> Test End Time 3:00 PM <br /> Final Reading 45 PSI <br /> Change in Reading 0 <br /> Pass/Fail Criteria PASS <br /> Tightness Test Results ® Pass ® Fail Ej Pass M Fail M Pass r] Fail ❑ Pass El Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by E] Manufacturer ® Industry Standard ® Professional Engineer <br /> Test Type ® Pressure 17 Vacuum Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ® Pass ® Fail ® Pass ® Fail ® Pass Ej Fail ❑ Pass ® Fail <br /> Pipe Run ID Smith Diesel <br /> Pipe Manufacturer <br /> Test Start Time 2:00 PM <br /> Initial Reading 45 PSI <br /> Test End Time 3:00 PM <br /> Final Reading 45 PSI <br /> Change in Reading 0 <br /> Pass/Fail Criteria PASS <br /> Tightness Test Results Pass ® Fail [ Pass ® Fail ® Pass ® Fail ® Pass ® Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />