My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
34243
>
2300 - Underground Storage Tank Program
>
PR0231801
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 8:35:05 AM
Creation date
1/29/2021 3:18:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231801
PE
2361
FACILITY_ID
FA0003290
FACILITY_NAME
COUNTRY MART GAS & FOOD
STREET_NUMBER
34243
Direction
S
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25318004
CURRENT_STATUS
01
SITE_LOCATION
34243 S CHRISMAN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> j . Since concrete will be broken near the Diesel tank , a secondary containment test must <br /> be performed on the Diesel tank once concrete is poured in accordance with the <br /> manufacturer' s guidelines . <br /> Please be aware that the facility cannot operate the Diesel UST system or receive fuel in the <br /> Diesel tank prior to the EHD inspection and approval. <br /> 4 . Secondary containment testing for the diesel piping and four (4 ) newly installed UDCs is <br /> required six months after installation . Provide 48 hours notification to the EHD when this test is <br /> scheduled . <br /> 5 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br /> a . Possess or be employed by a person who possesses one of several permissible valid , <br /> current contractor' s licenses issued by the Contractors State License Board (may be <br /> issued to the installation company) , or a Tank Tester' s license issued to the individual by <br /> the State Water Board <br /> b . Possess or work under the direct and personal supervision of an individual physically <br /> present at the work site who possesses a valid , current California UST Service Technician <br /> certificate issued by the International Code Council ( ICC) <br /> c. Possesses a valid , current certificate of training from the manufacturer(s ) of the <br /> component (s) being tested , repaired , or serviced <br /> 6 . Individuals installing underground storage tank system components must possess or work under <br /> the direct and personal supervision of an individual physically present at the work site who <br /> possesses all of the following : <br /> a . A valid , current contractor' s license issued by the Contractors State License Board <br /> b . A valid , current UST Installation /Retrofitting certificate issued by the International Code <br /> Council ( ICC ) <br /> c. A valid , current certificate of training from the manufacturer(s ) of the component (s ) being <br /> installed <br /> 7 . The tank owner or operator shall log into the California Environmental Reporting System <br /> ( CERS ) at http : //cers . calepa . ca . gov/ and ensure all UST information is current. <br /> 8 . The tank owner or operator shall log into CERS and complete and submit a UST Certification of <br /> Installation /Modification for the diesel piping and four (4) newly installed UDCs within 30 days . <br /> 9 . All components must be certified by an independent testing organization and labeled as <br /> required by the organization ( UL , ULC , ANSI , API , ASTM , etc . ) . See California Code of <br /> Regulations ( CCR) Title 23 , Chapter 16 , Table B for a complete list . <br /> 10 . Permit expires 180 days from the date of approval . If an extension to the expiration date is <br /> required , a written request must be submitted to this office prior to the expiration date . <br /> 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.