My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 3:46:24 PM
Creation date
1/29/2021 3:19:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: 9/9/21 <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />UST Monitoring Site Plan <br />Site Address: ABC Petroleum — Tracy Valero — 2375 Tracy Blvd Tracy CA 95376 <br />KEY..... ............................................. .I <br />A = ANNULAR Sensor . . . . . . . . . . <br />F = FILLS . . . . . . . . . . . . . <br />V = VAPOR . . . . . . . . . . . <br />P = PROBE . . . . . . . . . . . <br />L = Turbine / Leak Detector . . . . . . . . . . . . . <br />X = SUMP SENSOR . . . . . . . . . . . . . <br />B = Brine Sensor . . . . . . . . . . . . . . <br />S —Smart Sensor . . . . . . . . . . . . . . <br />C = Floats & Chains <br />E = E Stop . . . . . . . . . . . . . <br />.............................. <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />O <br />O <br />O <br />F <br />V <br />F <br />V <br />F <br />V <br />87 <br />91 <br />DIE <br />T L <br />X P <br />T L <br />X P <br />T L <br />X P <br />. . . . . . . . . . . . . . . . . . . . . drawing is <br />accurate, we <br />Ar�•15a ugra+ax4slrer ma aaee kisrb7s is llae ewrirrg tae7aaieame me a cannot speculate <br />. . . . . . . . . . . . . . p¢4rssictaol gcitima •and— sde&•f—m#f-nxniwnlprupaca- Bram ham . . . . blueprints. <br />. . . . . . . . . . . . . . . nxttawde . . . . . . . . // <br />Date map was drawn: 9/8/20 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.