Laserfiche WebLink
Inspection Report Comments: <br /> Notes: <br /> 1. The site was covered by overgrown vegetation. Overgrown vegetation could pose as a fire hazard. Operator should <br /> maintain vegetation to a minimum to prevent surface fires from occurring, which could cause a threat to public health and <br /> safety and the environment. <br /> 2. Andres and Olga Gomez are the new property owners. A Notice to Abate was mailed to the new property owners on <br /> May 7, 2018 instructing owners to submit a plan to investigate buried waste on site. The owners agreed to do the site <br /> investigation in the presence of the EHD and a hired licensed contractor. The EHD received site work plan from the <br /> Fremouw Environmental Services on July 3, 2018 and found it incomplete. <br /> The property owners learned after the sale that the previous landowners had used the premises as an illegal dump site <br /> with U.S. Bank Trust N.A. as lien holders. Altisource, which acted as Trustee for sale, is working as the agent for the <br /> seller, U.S. Bank N.A., to meet all legal requirements to remove all possible sources of wastes on the property, including <br /> areas used for dumping. <br /> The court case has not settled and a jury trial is set for March 29, 2021 (see attachment). <br /> Phase I of the Clean Closure and a quote for Phase II have been reviewed by the EHD. <br /> 3. Treated wood was observed onsite, on the north side of the residence. Operator shall remove treated wood and keep <br /> all receipts and/or records. The Environmental Health Department will track all removal. <br /> CalRecycle Solid Waste Information System(SWIS) 2 of 2 <br />