Laserfiche WebLink
Closed Disposal Site Inspection Report ( 188 ) <br /> Mulhair Disposal Site (39- CR- 0042 ) <br /> 5/2/2023 <br /> Notes : <br /> 1 . The previous area of concern for drainage and erosion control has been cleared . Owner/ <br /> operator is in the process of updating a work plan for excavation , screening , stockpiling , <br /> transportation and disposal of debris/ trash and sampling . <br /> 2 . On September 22 , 2022 , Hayward Environmental submitted an excavation , screening , <br /> stockpiling , transportation and disposal of debris/ trash and sampling (dated August 31 , 2022 ) <br /> to the EHD . A letter from the EHD was mailed to the property owners , Hayward Environmental <br /> Consulting , Sharp Environmental Technologies , and to the CVRWQCB . The letter was also <br /> provided to CalRecycle . The EHD did not approve the work plan for the excavation , <br /> screening , stockpiling , transportation and disposal of debris/trash and sampling . <br /> Owner/Operator should revise and resubmit the Work Plan to the EHD for review and <br /> approval . All site activities shall be in the presence of EHD staff. <br /> 3 . Overgrown vegetation observed on the old dumpsite . Maintain vegetation to a minimum to <br /> prevent fire hazards . <br /> 4 . If owners or potential buyers are contemplating any Post Closure Land Uses ( PCLUs) for <br /> the site , please be advised that there are additional requirements pertaining thereto . Pursuant <br /> to the PCLU provisions of T27CCR , Section 21190 , the PCLU Plan shall be submitted to the <br /> LEA , the Regional Water Quality Control Board ( RWQCB) , local air district and local land use <br /> agency for review and approval prior to commencing any construction or pre-construction <br /> activities for such PCLU . <br /> Attachments <br /> Mulhair Disposal Site <br /> CalRecycle Solid Waste Information System ( SWIS ) Page 2 of 2 <br /> n ,.. a _ /''k .. ... . 1 J . nn .. . . nn nnno 0 . CC n K A <br />