Laserfiche WebLink
EMED Model A1100 overfill <br /> WHEATON RETAIL Prevention Valve OPV <br /> Field Operational Test Procedure TP-A1100 <br /> For Primary Float and Flapper Vale <br /> Service Tools Reauired: <br /> • EMC❑ Model A0081-1101 test tool • Scribe tool <br /> CAUTION: <br /> 1. Always barricade work area to keep pedestrians and vehicles from accessing the storage tank area during preventive maintenance <br /> and/or compliance testing of the phase I system. <br /> Securing the FlaMer Valve: <br /> Step 1: Remove the spill container lid, Step 2: Remove the Model All 00 OPV <br /> fill cap and adapter from the tank fill from the tank fill riser. <br /> riser. Note; only remove manhole cover <br /> and water shroud system if necessary. <br /> j Primary <br /> I Float <br /> Step 3: Place the Model Al 100 OPV on Figure 1: Correct position, primary float Figure 2: Improper position, primary <br /> its side with the primary float facing facing downward. float facing upward <br /> downward. Refer to Figures Z and 2 <br /> for details. 1 <br />